+91-9818062147

GD5000-LLS HDD Machine in Harbin City – Liaoning Province Gas transmission pipeline project in Changchun city and Shenyang city

Project Name: Harbin City – Liaoning Province Gas transmission pipeline project.

Project location:Changchun city and Shenyang city

Pipe Specification:Φ1016mm*21mm,Φ114 Cable pipe

Construction Equipment: GD5000-LLS HDD Machine

Crossing length:1515m

Soil condition: SandRock

Project description: This project cross Daliaohe River, and get through Changchun, Gongzhuling city, Siping city, kaiyuan city, Tieling city, Xinmin city

the total crossing length is more than 1515m.