+91-9818062147

GD3500-LS HDD Machine in Liquefied Natural Gas Pipeline Crossing project in Hongchao River Guangxi Province

Project Name: Liquefied Natural Gas Pipeline Crossing project

Project location

Pipe Specification:Φ813mm

Construction Equipment: GD3500-LS HDD Machine

Crossing length:980m

Soil condition: Sand、rock、Shale and sand stone

Project Description:

This project get through the Hongchao River ,and the oil condition is so bad ,Part of the rock hardness up to 80 Mpa.